Languages
環興科技股份有限公司
Overview
Works: | 3 works in 3 publications in 1 languages |
---|
Titles
水庫安全管理系統功能擴充與應用 = = Function expansions and apploications of the management information system for the safety of reservoirs in Taiwan(1/2) / . (1/2)
by:
環興科技股份有限公司
(Language materials, printed)
氣候變遷對水環境之衝擊與調適研究第3階段管理計畫. = The Third stage management project of climate change impacts and adaptation on water environment(4/5) /. (4/5) =
by:
環興科技股份有限公司
(Language materials, printed)
中庄調整池工程計畫 = = The Jhong Jhuang adjustment lake engineering project-The hydraulic model study of JhongJhuang weir : 中庄攔河堰水工模型試驗報告 /
by:
環興科技股份有限公司; 國立臺灣大學水工試驗所
(Language materials, printed)
六河局轄區洪水預警及防汛整合作業 = = Integration plan of flood forecasting system & flood prevention for 6th river management office in 2016. . 105年度 /
by:
環興科技股份有限公司
(Language materials, printed)
六河局轄區洪水預警及防汛整合作業成果報告書 = = Integration plan of flood forecasting system & flood prevention for 6th river managemant office in 2013 / . 102年度
by:
環興科技股份有限公司
(Language materials, printed)
氣候變遷對水環境之衝擊與調適研究第3階段管理計畫. = The third stage management project of climate change impacts and adaptation on water environment /. (3/5) =
by:
環興科技股份有限公司
(Language materials, printed)
中庄調整池工程計畫 = = The project of JhongJhuang bank-side reservoir basic design and detailed design report : 基本及細部設計報告 /
by:
環興科技股份有限公司
(Language materials, printed)
氣候變遷對水環境之衝擊與調適研究第3階段管理計畫(2/5) = = The Third Stage Management Project of Climate Change Impacts and Adaptation on Water Enviroment(2/5) /
by:
環興科技股份有限公司
(Language materials, printed)
中區大用水戶輔導節水工作計畫. = 成果報告書 = Project of consulting on water saving for major water users in central Taiwan 2019 /. 108年度 :
by:
環興科技股份有限公司
(Language materials, printed)
海岸沙丘沙洲復育規劃 = = The Coastal sand dunes and sand bars restoration plan(1/2):a case study on tainan coast : 以臺南海岸為例 / . (1/2)
by:
環興科技股份有限公司
(Language materials, printed)
臺東成功鎮麒麟、和平及嘉平海岸基本資料監測調查計畫 = = Field investigation and analysis project at coastal area of chi-lin,he-ping and chia-ping in chenggong town,taitung /
by:
環興科技股份有限公司
(Language materials, printed)
氣候變遷對水環境之衝擊與調適研究第3階段管理計畫. = The third stage management project of climate change impacts and adaptation on water environment /. (5/5) =
by:
環興科技股份有限公司
(Language materials, printed)
台東海岸(太麻里段)環境營造改善計畫 = = The environment governance and renovation plan of the Taitung coast(Taimali area) / . (2/2)
by:
環興科技股份有限公司
(Language materials, printed)
八河局轄區洪水預報系統建立之先期規劃 = = The Advance Planning For The Establishment Of A Flood Warning System For The Area Of The 8th River Management Office /
by:
環興科技股份有限公司
(Language materials, printed)
氣候變遷知識庫與資料整合平臺 = = The platform for the knowledge and the databases of climate change / . (4/4)
by:
環興科技股份有限公司
(Language materials, printed)
莫拉克災後卑南溪堤防損害及改善方案研擬 = = Damage causalities and protection strategies of the riverbank in Pei-Nan river after morakot typhoon disasters /
by:
環興科技股份有限公司
(Language materials, printed)
六河局轄區洪水預警及防汛整合作業成果報告書 = = Integration plan of flood forecasting system & flood prevention for 6th river managemant office in 2015 / . 104年度
by:
環興科技股份有限公司
(Language materials, printed)
六河局轄區洪水預警及防汛整合作業成果報告書 = = Integration plan of flood forecasting system & flood prevention for 6th ricer managemant office in 2014 / . 103年度
by:
環興科技股份有限公司
(Language materials, printed)
Show more
Fewer